Manufacture (3)
Acquisition of many new clinics has meant
that new larger premises were required. The new premises being
Unit 1 Carrowreagh Business Park, Carrowreagh
Road, Dundonald
The floor space will be dramatically increased to 4300 Sq Ft.
The design of the site has been purpose built with all of the requirements
of a modern orthotic centre as proposed by the British Association
for Prosthetists and Orthotists guidelines for best practice.
The site includes:
First floor
· Suitable, convenient secure parking facilities · Main building
entrance area · Wheelchair access · Reception area · Waiting area
· Men and ladies toilet facilities · 2 highly equipped consulting/examination
rooms with walkway · Orthotist and administrative offices
Second floor
· Dispatch area · Store · Plaster area · Metal area · Leather
area · Shoe manufacture and adaptation area · Rest area
Manufacture: || 1
| 2 | 3
||
|